perforated cladding

Latest articles



Popular articles

  • hook

  • Hexagonal

  • The use of steel mesh saves a lot of on-site binding and construction site, can end civilized construction, advance the quality of steel structure engineering. Because the steel mesh is prefabricated in the factory, there is no need for site reprocessing, and there is no need for steel chips, because the construction cycle is shortened, and the cost of lifting machinery is reduced.

  • Alias: gabion mesh, heavy hexagonal mesh, ecological mesh, wire mesh, etc.
  • Latest articles

    Links