what size screws for 1 2 drywall ceiling

Latest articles



Popular articles

  • For key and important parts with tensile strength greater than 1034Mpa, the stress should be removed at 200±10℃ for more than 1 hour before plating, and for carburized or surface hardened parts, the stress should be removed at 140±10℃ for more than 5 hours. The cleaning agent used for cleaning shall have no effect on the binding force of the coating and no corrosion on the substrate. Acid activation Acid activation solution should be able to remove corrosion products and oxide film (skin) on the surface of parts without excessive corrosion on the matrix.
  • blade


  • Post time: 19-10-22
  • (1) In the painting construction should pay attention to ventilation, moisture-proof, fire prevention. The working environment and painting tools should be kept clean, the pressure of the air pump should be controlled within 0.63MPa, and the safety valve should be checked for failure.

  • Latest articles

    Links