nails that go through concrete

Latest articles

nails that go through concrete

...

nails that go through concrete nails that go through concrete

Read More
  • For key and important parts with tensile strength greater than 1034Mpa, the stress should be removed at 200±10℃ for more than 1 hour before plating, and for carburized or surface hardened parts, the stress should be removed at 140±10℃ for more than 5 hours. The cleaning agent used for cleaning shall have no effect on the binding force of the coating and no corrosion on the substrate. Acid activation Acid activation solution should be able to remove corrosion products and oxide film (skin) on the surface of parts without excessive corrosion on the matrix.

    nails that go through concrete

    ...

    nails that go through concrete nails that go through concrete

    Read More
  • At the time of production, the annealing wire will be processed according to the performance of the material. According to different needs, the degree of hardness and softness can be changed, which can make it have more advantages, reduce the consumption of metal and reduce the cost of production. In the use of the time does not need to carry out daily maintenance and maintenance, not only can save a lot of time, but also can reduce the cost, but also has good stability, strong corrosion resistance, greatly extend the service life.

    nails that go through concrete

    ...

    nails that go through concrete nails that go through concrete

    Read More
  • 

    Popular articles

    Latest articles

    Links