black annealed binding wire manufacturers

Latest articles


  • For key and important parts with tensile strength greater than 1034Mpa, the stress should be removed at 200±10℃ for more than 1 hour before plating, and for carburized or surface hardened parts, the stress should be removed at 140±10℃ for more than 5 hours. The cleaning agent used for cleaning shall have no effect on the binding force of the coating and no corrosion on the substrate. Acid activation Acid activation solution should be able to remove corrosion products and oxide film (skin) on the surface of parts without excessive corrosion on the matrix.
  • Weigh each reel of wire of different specifications, not less than the reel weight required in the contract, and record the value. Contact detection. No contacts are generated for each reel of wire. If there are contacts, no more than three contacts are generated for each reel. Each contact should be smooth surface treatment, the wire can not be pulled off from the contact, in line with customer packaging requirements.
  • Latest articles

    Links