12 gauge iron wire

Latest articles



Popular articles

  • pet

  • 1, stress relief before plating where the maximum tensile strength is greater than 1034Mpa key and important parts before plating should be at 200±10℃ stress relief for more than 1 hours, carburizing or surface quenching parts should be at 140±10℃ stress relief for more than 5 hours.


  • Post time: 24-04-22
  • The whole country is cooling down on a massive scale. People suddenly feel that winter is coming. In much of the north, the collection of central heating and heating has also begun. People who do not have central heating or do not want to use traditional heating choose air heating. As heating equipment enters the peak season, building network sales are also gradually increasing.

  • Latest articles

    Links