perforated corrugated metal ceiling

Latest articles



Popular articles

  • The drawing process of waste product drawing process has a great influence on product function. Generally, large total surface reduction rate (see area reduction rate) and small pass surface reduction rate (about ≤23%) are selected to ensure the tolerance of products. About high strength spring steel wire, the exit temperature of each pass steel wire should be controlled when drawing below 150℃, to prevent the steel wire from changing cracks due to strain aging, which is the main disadvantage of steel wire obsoletion.

  • No less than 5 disks should be extracted from each inspection lot for diameter error inspection. 1 point of steel wire should be extracted from each disk to measure steel wire diameter, and the actual diameter of steel wire at this point should be taken as the average value of the two vertical directions. The diameter error of cold-drawn low carbon steel wire should conform to the rules in the table below. The unqualified inspection batches shall be checked one by one, and the qualified batches can be used for engineering.

  • The distance between the adjacent two thorn rope installation do not know whether you have noticed? Careful observation can find that its spacing is not the same, the thorn rope factory for customer consultation when asking the installation height of the reason.

  • Latest articles

    Links