4x8 metal mesh sheets

Latest articles



Latest articles

  • 1, stress relief before plating where the maximum tensile strength is greater than 1034Mpa key and important parts before plating should be at 200±10℃ stress relief for more than 1 hours, carburizing or surface quenching parts should be at 140±10℃ stress relief for more than 5 hours.


  • Post time: 04-04-23

  • Many customers are in great need of galvanized barbed rope when they decide to purchase it, and the barbed rope specification determines the length of the later installation.

  • Links