Nailing Furring Strips to Concrete Block A Step-by-Step Guide
When it comes to finishing a basement or creating a level wall surface for drywall installation, nailing furring strips to concrete block is a popular and effective technique. Furring strips serve as a means of attaching insulation and drywall directly to the concrete block, providing a leveled surface that helps regulate temperature and moisture. In this article, we’ll explore the materials needed, preparation steps, and the precise method for nailing furring strips to concrete block walls.
Materials Needed
Before starting your project, gather the following materials
1. Furring Strips Typically made from wood (such as pine) or metal, these strips come in various lengths and widths. The standard dimensions are 1x3 or 1x4 inches. 2. Concrete Block Wall Ensure your wall is clean and free from debris. Inspect for cracks or issues that need addressing before installation. 3. Masonry Nails or Tapcon Screws Masonry nails can be used for wood furring strips, while Tapcon screws are ideal for a more durable connection with metal strips. 4. Hammer or Power Drill Use a hammer for masonry nails, or a power drill for Tapcon screws. 5. Level A 4-foot level is essential to ensure that the furring strips are installed evenly. 6. Measuring Tape Accurate measurements are vital for a proper fit. 7. Pencil For marking the location of the furring strips on the wall. 8. Insulation (if required) Depending on your project, you may want to include insulation between the furring strips.
Preparation Steps
1. Measure and Mark Using the measuring tape, measure the height of the wall and the space between furring strips. Typically, they are spaced 16 inches apart, aligning with standard drywall sizes. Mark the locations on the wall with a pencil to guide your installation.
2. Check for Level Before installing the furring strips, verify the level of the marks you’ve made. Adjust as necessary to ensure that when the strips are installed, they will create an even surface for drywall.
nailing furring strips to concrete block

Installation Method
1. Cut the Furring Strips If necessary, cut the furring strips to fit the height of the wall. Make sure to seal the cut ends with wood preservative if using wood strips to prevent moisture damage.
2. Position the Strips Start at one end of the wall and position the first furring strip against the concrete block, aligning it with your previously marked line.
3. Attach the Furring Strips - Using Masonry Nails If using masonry nails, begin by driving a nail into one end of the furring strip at a slight angle to anchor it. Then, drive in at least two more nails evenly spaced along the strip. - Using Tapcon Screws Drill pilot holes through the furring strip into the concrete block, ensuring they line up with the marks. Insert the Tapcon screws and tighten them securely to securely attach the strip.
4. Repeat the Process Continue installing additional furring strips, remembering to check for level after each one. Maintain the 16-inch spacing between each strip.
5. Insulation If you are adding insulation, measure and cut the insulation batts to fit snugly between the furring strips.
Conclusion
Nailing furring strips to concrete block walls may seem daunting, but with the right tools and materials, combined with careful measurement and installation, it becomes a manageable task. This process will provide a sturdy foundation for further construction, such as attaching drywall, while also improving the thermal efficiency of your space. With patience and precision, you'll have a finished wall that enhances both the appearance and comfort of your basement or constructed area. Whether you’re a DIY enthusiast or a seasoned carpenter, following these steps will lead to successful results in your next renovation project.